Todd County Facebook PageCode Red Signup for notifications

You are here

Public Works

PrintPrintEmail PageEmail Page

Todd County Public Works Department is responsible for the maintenance and construction of County State Aid Highways and County Roads, which include 617.25 miles of roadway and 92 bridges.  The Department’s primary functions are divided into the following two divisions:

The Maintenance Division is responsible for snowplowing, crack filling, sign installation, pavement maintenance, and drainage operations.

The Engineering Division is responsible for construction projects located on roads and bridges that require surveying, design, inspection, contract administration, and right of way acquisition.   The Engineering Division is also responsible for the annual countywide bridge inspection program.

Staff

Loren Fellbaum, Public Work Director  loren.fellbaum@co.todd.mn.us

Wade Jackson,  Assistant Public Works Director  wade.jackson@co.todd.mn.us

Paul Siegle, Maintenance Foreman   paul.siegle@co.todd.mn.us

Lori Becker, Accountant  lori.becker@co.todd.mn.us

Nanci Doroff, Administrative Technician nanci.doroff@co.todd.mn.us

Karl Pung, Assistant to Engineer  karl.pung@co.todd.mn.us

Todd Jackson, Engineering Supervisor  todd.jackson@co.todd.mn.us

Adam Olson, Sign Technician adam.olson@co.todd.mn.us

 

Hours of Operation:Normal HoursSummer Hours
Administrative/Engineering7:30am - 4pm M-F7am - 4:30pm M-Th
  8am - 12pm F
Maintenance Division7:30am - 4pm M-F6am - 4:30pm M-Th

 

 

 

 

The 2016 Spring Load Restrictions will be in effect Feb. 29th, 2016
Todd County will be removing Road Restrictions effective Thursday May 7th, 2015
As of May 6th, 2015, the official Speed Limit on County Road 12 from Trunk Highway 287 in Long Prairie to Trunk Highway 28 in Swanville has changed from 50 MPH to 55 MPH with a 35 MPH Speed Zone in the Pillsbury Lake Residential Area.

Pages

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer